-->
American Resources Policy Network
Promoting the development of American mineral resources.
  • EPA’s Bristol Bay Watershed Assessment: A Factual Review of a Hypothetical Scenario

    Testimony presented by Daniel McGroarty – Oversight Hearing of the U.S. House of Representatives Committee on Science, Space & Technology Subcommittee, August 1, 2013

    Chairman Broun, Ranking Member Maffei, Members of the Committee: Thank you for the opportunity to testify today. My name is Daniel McGroarty, and I am president of the American Resources Policy Network, an experts-led organization dedicated to exploring and informing the American public and American policy-makers of the importance of U.S. resource development – and the dangers of unnecessary foreign resource dependence.

    The Pebble deposit, the subject of the EPA assessment, is the largest potential copper mine in the United States. America’s lack of this critical metal has most notably been acknowledged in a recent Defense Department report as causing “a significant weapon system production delay for DoD.” Pebble is also potentially a multi-metal mine, with prospects beyond copper for the recovery of Molybdenum — used in alloy form in gun-barrels of many types, Rhenium — used in high-performance jet fighters, and Selenium and Tellurium, both of which are used in photovoltaic solar panels that could not only lead the Green Revolution – but provide a portable power source for U.S. troops in the field.

    As a matter of sound public policy, Pebble should be treated no differently than any other potential mineral resources project under the well-established environmental permitting process. But even before the permitting process has begun, Pebble has been subject to inconsistent and unprecedented treatment by the EPA — creating a troubling trend in public policy that has strategic implications. Given these factors, this Committee is right to examine the EPA’s actions in greater detail.

    American permitting needs to be predictable — not as to outcome, but in terms of process — in order to encourage investment in American resources. The hallmark of that process – in terms of environmental permitting and public participation — is the National Environmental Policy Act (NEPA).

    Yet, the very act of EPA conducting the Bristol Bay Watershed Study (hereinafter, the “Watershed Study”) — prior to Pebble submitting a mine plan or seeking a single permit — creates a chilling effect on investment in U.S. resource extraction. The likelihood that mine opponents are gearing up to use the Watershed Study as a reason to trigger a pre-emptive permit denial (before NEPA even begins) could deprive the U.S. of reliable sources of critical metals, responsibly extracted under American regulations.

    Every issue raised to justify the Watershed Study could easily and amply be raised and reviewed within the existing permitting process, with input from experts and the community. Put another way, there is no issue I see that requires the construction of a wholly new “pre-permitting process,” with the power to prevent a proposed project from even having the opportunity to be judged within the NEPA process.

    An unprecedented watershed assessment of a hypothetical mine — and even the minor contemplation of a preemptive permit veto — warrants an extremely high bar for the scientific method, the validity of source material, and the impartiality that must be met by this study.

    On all those counts, Mr. Chairman, we believe this assessment fails and falls short.

    At this point, two caveats: I am a policy analyst, not a scientist. The substantive points I will raise are detailed by experts, but should give all non-scientists reason for pause.

    So far, the most substantive review of one of the key studies in the Watershed Assessment – the EARTHWORKS-funded study, “Kuipers Maest, 2006, “Comparison of Predicted and Actual Water Quality at Hardrock Mines” led by Dr. Ann Maest (hereinafter, the “Kuipers Maest 2006 report”) — is an analysis conducted by global water and environmental management firm Schlumberger, on behalf of the Northwest Mining Association, and submitted to the EPA as part of NWMA’s Watershed Study comments. As the Schlumberger reports says, one of the fundamental tenets of scientific research is that its findings can be replicated by others, provided they have access to the data set. Schlumberger states that it cannot replicate the hydrological data presented in the Kuipers Maest 2006 report relied on by EPA.

    Second, Schlumberger finds what I have elsewhere noted as “backward bias” inherent in any hypothetical construct. Schlumberger notes that the Kuipers Maest 2006 report draws on a “preponderance” of case studies taken from mines that operated before the modern regulatory era.

    If the “data set” consists of a preponderance of mines permitted and operated before the modern era of regulatory limits – is it any surprise that these mines fell short of the modern limits?

    What does the failure of past mines have to do with a proposed mine –using current and perhaps even cutting-edge processes – and whether it will meet modern requirements?

    And how does it constitute “sound science” to argue against a proposed mine based on what happened at other mines operated to other standards 20, 30 or 40 years ago?

    Would we use such a backwards-biased yardstick to judge the safety of a new airplane? A new car? A new medicine?

    Is it “sound science” to say that poor performance in the past proves that we cannot achieve superior performance now and in the future?
    Now I will turn from the substance to sourcing — serious questions concerning the impartiality of experts relied upon by the EPA.

    My organization expressed these concerns in a letter sent to members of the House, Senate and administrators at EPA, which I include in my written testimony but will summarize here.

    Once again, the subject of concern is work done by Dr. Ann Maest and Stratus Consulting.

    Many of us saw the coverage of the Chevron environmental case in Ecuador, where plaintiffs were awarded an $18 billion dollar judgment against the oil company. This judgment has been the subject of extensive federal litigation in U.S. courts, where, among other charges, Chevron brought racketeering claims against members of the plaintiff’s team – including against Dr. Maest and Stratus. At the heart of these suits were claims that the plaintiff’s litigation team manipulated data to show contamination where no data existed and created a report written by the plaintiff’s team, including Maest and Stratus, that was then passed off as being written by a court-appointed independent consultant.

    How do we know this? For what must have been public relations reasons, the plaintiff’s team actually invited a film crew to document the behind-the-scenes events in a major environmental lawsuit for a favorable documentary. This documentary also generated hours of tape on the cutting-room floor that was uncovered during Chevron’s discovery process.

    Here is one such clip:

    [VIDEO]

    “Facts do not exist. Facts are created.” That’s the lawyer who directed the supposedly independent research. The woman chuckling in the seat next to him is Dr. Ann Maest: the scientist who conducted the Ecuador study, and later disavowed its findings…

    …The very same scientist whose work is cited multiple times in the Bristol Bay Watershed Study.

    And while the Chevron litigation is still ongoing, Maest and Stratus settled claims against them by submitting sworn statements that “renounced all of the scientific findings” in their report.

    Stratus and Maest have numerous contracts with EPA and Maest’s work is cited 11 times in the Watershed Study – seven of those in reference to the Stratus consulting firm.

    EPA — apparently understanding the controversy surrounding this work — ordered a quasi-peer review of the Kuipers Maest 2006 report as part of addendum to the second draft of the Watershed Study. I call it a “quasi-peer review” because EPA’s last-minute effort falls seriously short of basic peer review standards.

    Case in point: the review relied on one scientist who was a former colleague at the Stratus firm who had coauthored studies with Dr. Maest. The Committee can consider for itself whether this constitutes the kind of independent assessment that defines peer review.

    So, to sum up: in the Ecuador incident, the scientist has disavowed her work.

    Her firm has cut its ties to her.

    And yet EPA builds its Watershed Study on her work.

    I want to be clear on this point: I do not know whether the work used in the Watershed Study will prove to show issues similar to the Ecuador studies that the author disavowed. My point is that this question needs to be examined – impartially, independently – and that absent that, EPA’s reliance on work done by this scientist or her firm in the Watershed Study puts the entire study under a cloud.

    In closing, there’s a quote I’d like to share with the Committee:
    “NEPA is democratic at its core. In many cases, NEPA gives citizens their only opportunity to voice concerns about a project’s impact on their community… And because informed public engagement often produces ideas, information, and even solutions that the government might otherwise overlook, NEPA leads to better decisions — and better outcomes — for everyone. The NEPA process has saved money, time, lives, historical sites, endangered species, and public lands while encouraging compromise and cultivating better projects with more public support.
    …because of NEPA — …we are guaranteed a voice.”

    That quote is from the website of the Natural Resources Defense Council (NRDC). They love NEPA — just not this time, for this project.

    That’s a dangerous departure from the law. This time, the mine is Pebble and the metal is copper. But if we allow this precedent, there will be many mines and projects that don’t get built – and many metals we’ll be forced to import, many times from nations that wish us harm.

    We have a process in place to determine whether a mine should or shouldn’t be built. We should follow that process – to lead us to a policy based on science, and projects made better by the even-handed scrutiny they receive.

    Thank you.

    # # #

  • Congressional hearing on Bristol Bay Watershed Assessment underscores importance of due process

    The debate over the EPA’s controversial Bristol Bay Watershed Assessment entered another stage this week, with the U.S. House of Representatives, Committee on Science, Space & Technology, Subcommittee on Oversight holding a hearing on its merits.

    Invited to testify before the committee, American Resources Principal Daniel McGroarty outlined the flaws and challenges associated with this precedent-setting and inconsistent pre-emptive review outside the parameters of the established NEPA process.

    Said McGroarty:

    “Every issue raised to justify the Watershed Study could easily and amply be raised and reviewed within the existing permitting process, with input from experts of all kinds, and community input as well. Put another way, there is no issue I see that requires the construction of a wholly new “pre-permitting process,” with the power to prevent a proposed project from even having the opportunity to be judged within the NEPA process.

    “An unprecedented watershed assessment of a hypothetical mine — and even the minor contemplation of a preemptive permit veto — warrants an extremely high bar for the scientific method, the validity of source material, and the impartiality that must be met by this study.”

    Citing the inclusion of studies by now-discredited scientists into EPA’s assessment, McGroarty made the case for EPA to conduct an independent and impartial investigation of the use of these studies and called for due process within the framework of the federal permitting process – a position that had previously won the support of the Washington Post’s editorial board and the left-leaning Center for American Progress – both of whom are not known to be mouthpieces for the mining industry.

    McGroarty’s call was echoed by Subcommittee on Oversight Chairman Paul Broun (R-GA) (a self-proclaimed avid fisherman and hunter), who emphasized that while he was not an advocate for or against the Pebble mine, a “preemptive veto by EPA would set a dangerous precedent, and could have a chilling effect on similar projects throughout the nation.”

    Interestingly, near the beginning of the questioning, Doctor Broun asked each witness if there was anything unique in the assessment that would not be addressed in a future environmental impact study. Each person said “no,” even Wayne Nastri (reluctantly), the co-president of E4 Strategic Solutions and Former Regional Administrator of USEPA Region 9, who was testifying on behalf of the anti-Pebble faction.

    That no one was able to answer affirmatively, and that Doctor Broun — a self-proclaimed conservationist — was the one defending the NEPA process, speaks to the importance of proceeding with the review within the parameters of the given federal framework.

    For written witness remarks and audio/video footage of the hearing, click here.

  • Congressional Committee Investigates EPA’s Bristol Bay Watershed Assessment

    ARPN President Testifies on Use of Questionable Research and Calls for Review of Data WASHINGTON, D.C. – Daniel McGroarty, American Resources Policy Network President, provided testimony today on Capitol Hill concerning the EPA’s Bristol Bay Watershed Assessment, a major environmental study in Alaska. “The problem with the Assessment has always been that EPA is preempting (…) more

  • Senate hearing puts price tag on EPA’s Bristol Bay Watershed Assessment

    The Daily Caller Foundation’s Michael Bastasch, who has consistently offered thorough coverage of some of the most pressing mineral- and mining-related issues, last week took a closer look at the U.S. Environmental Protection Agency’s spending on the agency’s controversial Bristol Bay Watershed Assessment. According to Bastasch, during a recent U.S. Senate hearing, “Ken Kopocis, President (…) more

  • Not “sexy” but critical – Antimony

    When discussing critical mineral supply woes, Rare Earths are always the first minerals to come to mind. However, we at American Resources have consistently made the point that our mineral resource dependencies stretch far beyond the Rare Earths. Antimony is a case in point. A recent Resource Investing News piece argues that while not a (…) more

  • Compliance with conflict minerals rule remains challenging for manufacturers

    Compliance with federal law and a new SEC rule regarding the sourcing of so-called conflict minerals — Tungsten, Tin, Tantalum and Gold from the Eastern region of the Democratic Republic of the Congo and surrounding regions — remains challenging. For U.S. manufacturers to navigate and properly follow the new guidelines is just one piece of (…) more

  • U.S. Chamber supports strategic metals bill

    Bearing testimony to the fact that access to critical mineral supplies is a key issue for our U.S. domestic business and manufacturing base, the U.S. Chamber of Commerce has endorsed Rep. Mark Amodei’s (R, Nev.) “National Strategic and Critical Minerals Production Act of 2013” (H.R. 761) Citing the Behre Dolbear report we have frequently invoked (…) more

  • Motley Fool zeroes in on Copper

    In a three-part series, Nick Slepko, a member of the The Motley Fool Blog Network, zeroes in on the importance of Copper. Considering the current controversy over the U.S. Environmental Protection Agency’s actions regarding what could conceivably be the largest deposit of critical minerals in U.S. history – the Pebble Deposit in Alaska – the (…) more

  • Tellurium – a critical mineral to be watched

    In her latest piece for ProEdgeWire, Robin Bromby suggests that Tellurium may well be the newest critical metal. Citing two “throwaway lines” from recent reports and media reporting which indicate increased demand for the metal, Bromby goes on to give reasons why Tellurium should be placed on observers’ critical metals watch lists: “Tellurium is vital (…) more

  • Debate over Bristol Bay Watershed Assessment should focus on NEPA process, not emotional hyperbole and over-simplification

    With the public commenting period for the EPA’s revised Bristol Bay Watershed Assessment now closed, Environment and Energy Publishing’s Manuel Quinones zeroes in on the comments submitted to the agency in his latest piece for E&E Daily (subscription required). According to the article, the battle lines are drawn on the push by environmentalist groups for (…) more

Archives